You are on page 1of 58

ADA Cellworks

IBS TRAINING
PREPARED BY: JAYAN.Y ADA CELLWORKS,PUNE

ADA Cellworks

CONTENTS
       

IBS SURVEY LINK BUDGET CALCULATION IMPLEMENTATION QUALITY CHECKLIST VENDOR HANDLING TIPS REPEATER BASIC OF LOS SURVEY BASIC OF RF SURVEY

ADA Cellworks

What is IBS/DAS ?
1.In-building Solution (IBS) / Distributed Antenna System (DAS) 1.Small Cell Coverage within building premises 2.Signal is restricted inside the building 3.Antenna installed inside the building 4.Low Transmit Power of Antenna 5.Smaller Antenna size

ADA Cellworks

What drives the need for IBS ?
1. Demand of Continuous coverage 2. Indoor Activities generating high traffic 3. Poor indoor coverage of outdoor sites 4. Offloading outdoor cells with high utilization 5. Improvement of Network Performance.

ADA Cellworks

IBS Project 1.Site Survey (IBS and LOS) 2.Design report preparation of the survey 3.Implementation work 4.Frequency planning and database preparation 5.Walk test 6.Optimization and site handover

IBS Planning .ADA Cellworks PLANNING PROCESS Survey.

ADA Cellworks IBS Planning Process Flow Chart SITE ACQUISITION Customer request 1. Without target buildings target buildings -> Preliminary site survey -> Area survey to locate possible -> Approval: customer accepts target buildings . With target buildings 2.

4. 3. Budgetary Cost Estimation.ADA Cellworks PRELIMINARY SITE SURVEY/PRE. Draft Solution Design. Surrounding Network Information.PLANNING 1. . 2. Building Information.

Microwave Pole location.ADA Cellworks SITE SURVEY 1. Propagation Measurement. 3. BTS Location. 4. Final Cable routing. 2. Photos of Antenna Location. . Final BTS & Antenna location.

Solution Description Template. System Diagram (Trunking Diagram). 3. .ADA Cellworks DETAIL DESIGN REPORT 1. TSSR (Technical Site Survey Report) for BTS & Microwave details. 2. Power Budget Calculation. 4.

11.VIP Guest House.Corporate Residential Complex. 10. 5. 7.Railway Stations. 8.Airports.Shopping Malls.Hotels & Restaurants. 9. 6.Office Complex 2. 3.Hospitals.Exhibition Centre.Factories & Industries .ADA Cellworks TYPES OF TYPICAL BUILDINGS COVERED IN IBS 1.Government Buildings. 4.

ADA Cellworks IBS SURVEY & PRE-PLANNING .

7. 3. 4. Digital Camera. Magnetic Compass. Net Monitor Phone. Floor Plan of that Particular Site . 5. 6. Measuring Tape. GPS 2.ADA Cellworks TOOLS REQUIRED FOR IBS SURVEY 1. Binoculars.

Mark the present signal level and the antenna location to be installed in the floor plan. Study the building architecture. future Subscriber growth etc. Capacity. Note down all the present serving cell information like CELL ID. Identify the duct for the cable routing & component location. antenna locations and mark on the floor plan. Also not down the type of ceiling.ADA Cellworks STEPS IN IBS SURVEY 1. 7. with the help of floor plans & guidance from Building authorities 2. Identify the BTS location. Understand the requirements need in terms of Coverage. Rx. 5. Level. 6. 3. 8. BCCH. Survey on each floor using net monitor and floor plan. etc. 4. whether pop cutting is required or not .

NOT MENDATORY ) CHECK POSSIBILITY OF CABLE ROUTING UPTO BTS LOCATION IF PCM CABLE OR A-BTS IS REQUIRED FOR TX .RTT.ADA Cellworks LOS SURVEY MAKE TERRACE LAY OUT TAKE LAT – LONG BY GPS ASK FOR FAR END TO SURVEY CO ORDINATOR DECIDE TOWER HEIGHT( e. ( DO NOT COMPROMISE WITH BTS LOCATION IT AFFECTS POWER CALCUTAION ) . GBT )REQUIREMENT ( ALSO CONSIDER CUSTOMER SPECIFICATION . g POLE.THEN MAKE NOTE THAT PCM CABLE LENGTH IS NOT EXCEEDING BY THAT OF GIVEN SPECIFICATION( UPTO 250 M).

. residential home.ADA Cellworks INDOOR PROPOGATION  Indoor channels are different from traditional mobile radio channels in two different ways • The distances covered are much smaller • The variability of the environment is much greater for a much smaller range of Tx-Rx separation distances.  Indoor propagation is dominated by the same mechanisms as outdoor • reflection.. factory..  The propagation inside a building is influenced by • Layout of the building • Construction materials  Typical building type • Sports arena.. scattering. diffraction.

ADA Cellworks  However. etc. conditions are much more variable • Doors/windows open or not  The mounting place of antenna • On the wall. • The level of floors  In building path loss factors • Partition losses (same floor) • Partition losses between floors . ceiling.

ADA Cellworks PARTITION LOSSES  There are two kind of partition at the same floor: • Hard partitions: the walls of the rooms • Soft partitions: moveable partitions that does not span to the ceiling • The path loss depends on the type of the partitions PARTITION LOSSES BETWEEN FLOORS  The losses between floors of a building are determined by • External dimensions and materials of the building • Type of construction used to create floors • External surroundings • Number of windows • Presence of tinting on windows .

open premises like sports arena. flexibility in the Design when shaping the coverage area. robust and well proven technique  Leaky Cable This type is mainly used in Train tunnels. where it is tough to install with Coax feeder network. It also has flexible design but it is costly  Antennas Distributed Via Fibre Optic Network Low attenuation is the key factor for the deploying IBS thro fibre ..g. It has some advantage like low cost.ADA Cellworks o Antenna System used in IBS  Integrated Antenna System An Indoor area covered by one location e. railway station where BTS is mounted on the wall connected to the Integrated antenna system  Antennas Distributed Via Coax Feeder Network This is the most simplified method used in IBS.

ADA Cellworks 14M SP4W5F01 27M SP3W5F01 15M J 08M AN5F005 AN5F006 AN5F007 AN5F008 AN5F009 AN5F010 AN5F011 AN5F012 19M 23M SP3W5F02 SP2W5F04 09M 08M SP2W5F05 SP3W5F03 09M 15M 03M 14M AN6F001 3M AN5F013 AN5F014 AN5F025 06M 11M AN5F004 AN5F003 24M SP2W5F01 10M J 9M SP2W5F02 06M SP2W5F03 10M 25M 17M J SP4W5F02 11M 6M 30M 04M AN5F015 13M AN5F002 AN5F001 AN5F016 AN5F022 AN5F023 AN5F017 AN5F021 12M 08M A 5M 14M 10dB CP10dB5F01 7dB CP7dB5F01 SP2W5F06 CP7dB5F02 7dB 07M 10M 20M 7dB J 15M 15M AN5F018 AN5F019 AN5F020 AN5F025 CP7dB5F03 SP4W5F03 10M 21M .

ADA Cellworks 17M 11M 13M 23M AN5F010 AN5F011 AN5F0139 AN5F018 AN5F019 J AN5F003 SP3W5F02 15M 10M SP4W5F01 7M 21M 5M SP4W5F03 18M J 7dB AN5F020 08M SP2W5F04 11M 08M AN5F022 AN5F023 AN5F017 Cable goes to the sixth floor 24M AN5F004 AN5F009 10M SP2W5F01 J AN5F002 SP2W5F03 CP7dB5F01 J 7dB AN5F005 25M AN5F012 23M SP3W5F01 20M CP7dB5F03 23M 13M AN5F016 7dB 3M CP7dB5F02 19M 30M AN5F013 09M 14M 10dB SP2W5F02 14M 6M 8M 10M AN5F008 14M 8M 14M SP2W5F06 AN5F021 CP10dB5F01 SP4W5F02 8M AN5F140 AN5F006 AN5F007 09M SP3W5F03 SP2W5F05 3M 4M AN5F001 AN5F014 AN5F015 DUCT – 1( ELECTRICAL) .

which is defined below. EIRP( Effective Isotropic Radiated Power )= ERP( Effective Radiated Power ) + Gain of that component LIST OF COMPONENTS WITH LOSSES ARE AS FOLLOWS:: 1) 2) 3) 4) 5) 6) SPLITTERS COUPLERS CABLES ANTENNAS COMBINER JUMPER CABLE .LINK BUDGET CALCULATION ADA Cellworks IT IS BASICALLY FOR POWER THAT REQUIRED AT ANTENNA END. We generally deal with EIRP ( Effective Isotropic Radiated Power ).IT DEPENDS ON THE COMPONENTS THAT HAS BEEN USED FROM BTS TO ANTENNA THAT IS ERP( EFFECTIVE RADIATED POWER ).

25 -5.05 -6.1) SPLITTERS:: ADA Cellworks Generally 3 types of splitters are used in IBS which are as follows.25 . 2 WAY 3 WAY 4 WAY TYPE LOSS (dB) -3.

1) SPLITTERS ( Continue ):: ADA Cellworks 2 WAY 3 WAY 4 WAY .

. which is mentioned in table.3 NOTE: Ideally there should be 0 dB loss at through port.2) COUPLERS:: ADA Cellworks TYPE LOSS AT COUPLE PORT (dB) LOSS AT THROUGH PORT (dB) 7 dB 10 dB 15 dB -7 -10 -15 -1.5 -0.5 -0. But there is always some loss.

2) COUPLERS ( Continue ):: ADA Cellworks THROUGH PORT COUPLED PORT INPUT .

3) CABLES:: ADA Cellworks TYPE LOSS (dB per meter) ½ ‘’( LDF4-50 A) 7/8 ‘’( LDF5-50 A ) 1-5/8’’ ( LDF7-50 A ) -0.03 .06 -0.11 -0.

3) CABLES ( Continue ):: ADA Cellworks .

which are as follows. TYPE Gain (dBi ) 2 PANEL ANTENNA 7 FLAT PATCH OMNI ANTENNA 5 OMNI ANTENNA .4) ANTENNAS:: ADA Cellworks Generally 3 types of antenna are used in IBS.

4) ANTENNAS ( Continue ):: ADA Cellworks OMNI ANTENNA .

4) ANTENNAS ( Continue ):: ADA Cellworks PANEL ANTENNA .

4) ANTENNAS ( Continue ):: ADA Cellworks 12 cm 12 cm FLAT PATCH OMNI ANTENNA ( Vendor : Kaweri ) .

g TRX TX 2 A N T E N N A . HYBRID COMBINER( 2 I/P.1 O/P ) 3 dB TX 1 e.5) COMBINER:: ADA Cellworks TYPE LOSS A combiner is the device that enables several transmitters to transmitter from the same antenna.

ADA Cellworks 6) LINK BUDGET CALCULATION :: Example with Trunking Diagram: .

ADA Cellworks NOTE:BTS POWER IS MENTIONED AS 37 CONSIDERING 3dB COMBINER LOSS. .

.6) DIFFERENT CONNECTOR USED IN IMPLEMENTATION: ( 1 ) ½ N MALE CONNECTOR( L4PNM-RC ) ADA Cellworks Connect with antenna port Or splitter port. Connect with ½ cable To connect female port of other component like our antennas and splitter.

( 2 ) ½ N FEMALE CONNECTOR( L4PNF-RC ) ADA Cellworks Connect with male port like 7/8 to ½ inch connector Or Kaveri combiner Connect with ½ cable To connect male port of other component like 7/8 to ½ connector. .

( 3 ) 7/8 to ½ inch CONNECTOR( L5PNM-RC ) ADA Cellworks Connect with female port like Our antannas and splitter Connect with 7/8 cable( LDF 5-50A ) To connect female port of 7/8 cable at one side and female port of ½ cable or splitter .

( 4 ) DIN Male for LDF5-50 A 7/8 inch Cable( L5PDM-RPC ) ADA Cellworks Connect with female port of jumper cable or directly to Port of BTS which is Generally at the top of Ultra BTS Connect with 7/8 cable( LDF 5-50A ) To connect female port of 7/8 cable at one side and BTS port or jumper cable .

( 5 ) EXTERNAL COMBINER(AVANTEL) ADA Cellworks Female Port Female Port Female Port .

( 6 ) EXTERNAL COMBINER(KAVERI) ( 6 ) EXTERNAL COMBINER(KAVERI) ADA Cellworks Female Port Female Port Female Port .

( 7 ) EXTERNAL JUMPER CABLE ADA Cellworks THIS PORT HAS SIZE SAME AS 7/8 CABLE AT COMBIER END AT BTS END .

8KVVAC / 1.5KVADC .7) BTS Types: Generally 3 types of BTS Available. 1) Ultra BTS ADA Cellworks Configuration: 4+4+4 Power: 43 dBm Nominal Voltage:230AC/-48VDC Cabinet Max. power Demand:1.

2) METRO BTS ADA Cellworks 85cm 25cm 35cm Configuration: 2+2 Power: 40 dBm .

ADA Cellworks SECTOR’S JUMPER CABLE MW CABLE FOR CONNECTIVITY .

3) ULTRA MINI BTS ADA Cellworks It looks same as Ultra BTS. Configuration: 2+2 Power: 43 dBm .

Trunking Diagram . 5. 3. considering all the losses. of Floors. .Material Requirement for the Implementation of DAS. 6. Lobbies. BTS Information: BTS Type. BTS O/P power. Link Budget Calculations – EIRP calculation at all antenna ports. 7. Building Information: Co-ordinates. No. Basements. combiners & couplers. Bill of Quantity . splitters.ADA Cellworks DETAILED DESIGN REPORT 1. TSSR Form – Transmission & RF details if planned with outdoor sectors also) 4. Planned Antenna Location with coverage area. Sectorization.Schematic Presentation of Antenna to BTS connection via different components like. TRX Configuration. 2.

ADA Cellworks It amplifies and converts weak signal into stronger signal by adding some gain to it.REPEATER : Generally used where capacity required is low. There are 2 types of repeaters. . 1) BAND SELECTIVE: It amplifies and boost frequency of particular BAND 2) FREQUENCY SELECTIVE: It amplifies and boost particular frequencies only (Generally 2 / 3 frequency.

ADA Cellworks TYPICAL REPEATER INSTALLATION .

ADA Cellworks PICK UP ANTENNA(HIGHLY DIRECTIONAL ) NEARER SITE .

( 33 dBm ) BAND SELECTIVE INDOOR REPEATER .ADA Cellworks CONNECTED TO ANTENNA CONNECTED TO PEAK UP ANTENNA POWER: 2W GENERALLY.

ADA Cellworks IBS IMPLEMENTATION .

ADA Cellworks TYPICAL IBS INSTALLATION .

e. typical requirement is as follows i.  THERE IS NO PROPER SADDLING. coupler port is open  COUPLER Couple port/through port is reversed Input port/through port is reversed  LABELING All the splitters and couplers should be labeled for easy identification  ANTENNA PLACEMENT OR ORIENTATIONS IS NOT AS PER PLAN Shift in antennas if any due to route / customer problem..ADA Cellworks GENERAL IMPLEMENTATION ISSUE IN IBS  OPEN CONNECTION Antenna. every 1mtr or 1. TYING OF CABLES No Saddling/tying done on site. splitter.5mtr cable is to be tied  REQUIREMENT OF EXTRA MATERIAL Clamps FOR Antennas/cable .

2. material storage space. Ask vendor for daily update. Must visit site 2-3 day in week. Handover site to vendor with all details like work permission. 5. proper cable routing. Ask all details after completion of full site. 4. Generate MRF for delivery of material to this site.ADA Cellworks VENDOR HANDLING 1. 3. Get the material details from the vendor 7. 6. Get the BOM (Bill of Material) from the vendor and generate cam Form for the site after reconciling the material .

ADA Cellworks IMPLIMENTATION AUDIT Visit site daily if possible otherwise 2-3 day in week Check installation is as par plan or change Decide any changes in antenna location (if require according to aesthetic.) . cable routing etc. permission..

Feeder Cable and components have to be independently & properly clamped (saddling) to the wall or laid over the cable tray .ADA Cellworks IBS IMPLEMENTATION QUALITY STANDARDS. 2. Feeders & components should be anchored at fixed intervals by saddling/cable tie 7. Connector have to be weather proofed 6. 1. No Extra Cable is left rolled near the BTS Equipment. Aesthetic rectification should be completed with cleanliness . Combiner is clamped and the various cables to and from the combiner are secured properly on the Cable tray or Wall mount. 5. 3. 4. Feeder Installation for all the sectors should have appropriate bending radius for both 1/2” & 7/8”.

ADA Cellworks THANK YOU… .